欧美日本在线播放-欧美日本在线-欧美日本一区亚洲欧美一区-欧美日本一区视频免费-欧美日本一区二区三区生-欧美日本一区二区三区

環保誠信企業
Honor

TEL:+86 0536-6162866+86 187-6464-2379

ADD:No.19, Shunde Road, Zhucheng City, Shandong, China

WEB:www.uplee.com.cn

Fertilizer sewage treatment plant

  • Fertilizer sewage treatment plant
    1. Fertilizer sewage treatment plant
  • MS:Katherine Wong

    +86 187-6464-2379

  • TEL:+86 0536 6162866

    MAIL:sales@cntianlang.com

  • 二維碼

Fertilizer sewage treatment plant

Name: Fertilizer sewage treatment plant

details

Note: The following are just a few common treatment methods. The specific processing method needs to be customized for you in combination with your situation. If you need detailed plans and quotations, please call our company service hotline, we have a dedicated technical staff to give you free programs and quotations.

At present, there are several types of sewage phosphorus removal technologies at home and abroad: biological methods, physicochemical methods and biochemical methods. The physicochemical method mainly includes coagulation sedimentation method, electrolytic dialysis method, reverse osmosis method, crystallization method and ion exchange adsorption method, etc. These methods have good phosphorus removal effect and stable operation, and are particularly suitable for treating high flow rate. Concentration of phosphorus-containing industrial wastewater.

Treatment process after workshop wastewater reform

The phosphorus-containing production wastewater flows into the regulating tank from the workshop, and the reaction agent lime milk is mixed with the wastewater before the pump, and then pumped to the reaction tank 1# to stir and mix the reaction (the mixture is automatically controlled by the pH measurement and control system to control the dosage of the lime milk. The pH was stabilized at about 11.0), and then the reaction was carried out through the reaction tanks 2# and 3# in sequence, so that most of the total phosphorus in the wastewater was precipitated and removed. After that, the wastewater is mixed by the swash plate to cause a coagulation reaction, thereby removing other pollutants and part of residual phosphorus in the wastewater.

Thereafter, the wastewater is subjected to secondary precipitation, sand filtration, and activated carbon adsorption treatment, and then enters the neutralization tank, and is neutralized with dilute hydrochloric acid to adjust the pH value and then discharged. After the precipitator precipitates, it flows into the air flotation device, and mixes with the injected flocculant to cause a coagulation reaction, thereby removing other pollutants and part of residual phosphorus in the wastewater. Thereafter, the wastewater is subjected to secondary precipitation, sand filtration, and activated carbon adsorption treatment, and then enters the neutralization tank, and is neutralized with dilute hydrochloric acid to adjust the pH value and then discharged.



Purchase Hotline: +86 187-6464-2379
主站蜘蛛池模板: 四虎精品永久免费| 99久久免费国产香蕉麻豆| 国产肥臀| 亚洲好色网| 久久精品视频uu| 午夜国产精品视频| 维修工的调教| 久久视热频国产这里只有精品23| 乳色吐息讲的是什么| 91porn最新地址| 日本不卡免免费观看| 国产草逼视频| 男人最爱看的网站| 成人在线观看网站| 天天色视频| 亚洲色图欧美色| 国产精品日本亚洲777| 男生操女生动态图| 小鸟酱视频在线观看| 精品一产品大全| 欧美一区二区三区四区在线观看 | 大象传媒短视频网站| 国产精品一在线观看| 免费看日本| 99热这里只有精品在线播放| www.av在线免费观看| 香蕉国产成版人视频在线观看| 国产日本免费| 色淫影院| 亚洲色图.com| 欧美男同video| gay小太正初精| 91porn最新地址| 国产精品成人在线播放| 日本欧美一二三区色视频| 天天做天天爽天天谢| 50度灰破解版v5.7.0| 久久精品国产免费播放| 天码毛片一区二区三区入口| 忘忧草在线| 日本妇人成熟免费不卡片|